Sacred Heart Matraville.
Education3 Staged Cleans0 Defects at HandoverCleaned & CaulkedNSW
The Challenge
A school redevelopment by COWYN with the students never leaving the site. Areas handed back in stages rather than all at once, around term dates that do not move. Every handback had to be safe for children the next morning.
The Solution
- Builders clean
Cleaned to the staging program, not the building: each zone finished, inspected and handed back before the next opened up.
- Site amenities cleaning
Early learning areas detailed to a standard set by the age group using them.
- Window and facade cleaning
Glazing detailed zone by zone as each handed back.
Zone by zone through the program, each handback inspected before the next opened. Walked against the scope at every stage, with the school open the whole way through.
Enquiry
Get a quote.
Get a quote.
We answer the phone.
Send site details or plans and we'll come back inside 24 hours with a clear, itemised scope.