Moruben Road.

Client
David Campbell Building
Completed
November 2024
Reference
J-1121
Location
Mosman, NSW
Residential3 Staged Cleans0 Defects at HandoverCleaned & CaulkedNSW

The Challenge

Two years of building went into this home. Timber floors, glass balustrades, highlights and skylights, natural stone, sandstone retaining walls. Finishes like these are unforgiving. The wrong product tarnishes stone. The wrong tool scratches glass. Every surface needs an expert cleaner with the right product for it, or two years of work gets damaged in the final week.

Drone footage from handover day
Builders Clean for David Campbell Building
Finished terrace with outdoor kitchen at dusk after the final clean and pressure wash

The Solution

  • Builders clean

    Three staged cleans kept the site clean and maintained through the build. Finishes protected. Defects found early, not at handover.

  • Caulking

    All wet areas and skirting. Every colour matched so well you can't even see the caulking.

  • Pressure washing

    Soft washing for the sandstone retaining walls. Pressure washing for the muddy footprints on walkways once landscaping wrapped up.

  • Carpet steam cleaning

    Called in after a water leak in the bathrooms. Mistakes happen. Lucky we were equipped for the job.

One contractor held the finish instead of four. No defects at handover. The client walked into a finished home, not a site with the dust taken off.

Enquiry

Get a quote.
We answer the phone.

Send site details or plans and we'll come back inside 24 hours with a clear, itemised scope.

Turnaround24 hours
Cover$20M Public Liability Insurance & Workers Compensation Insurance
AreasSydney · Melbourne · Brisbane · Adelaide · Perth
Direct line0467 624 049