Hamsi Taverna.

Client
Unita
Completed
January 2026
Reference
J-1128
Location
Glebe, NSW
Hospitality3 Staged Cleans0 Defects at HandoverCleaned & CaulkedNSW

The Challenge

A six week fitout, delivered over Christmas. Timber floors, brick feature walls throughout, epoxy grout in the back of house, expensive furniture and a kitchen full of appliances, all landing at once. A program most cleaning companies would not touch. So our team went to night works, cleaning through peak holiday season to get it across the line.

Hamsi Taverna dining room detailed to opening standard by Builders Clean
Photographs: Brock B Studio
Builders Clean for Unita
Bar and dining detail at Hamsi Taverna after the final clean

The Solution

  • Builders clean

    Staged cleans around the trades, so finished joinery was never the dust catcher for work overhead.

  • Window and facade cleaning

    Glazing to the water, detailed inside and out until the room reads clear from every seat.

  • Caulking

    Bar, kitchen and wet area joints sealed and colour matched before the operator moved in.

The final stage took brick, brass, banquettes and the bar to a hygiene standard a normal builders clean does not reach. A supervisor walked the room against the scope before handover. Handed over ready to seat diners, and the taverna is already a Fish Markets favourite.

Enquiry

Get a quote.
We answer the phone.

Send site details or plans and we'll come back inside 24 hours with a clear, itemised scope.

Turnaround24 hours
Cover$20M Public Liability Insurance & Workers Compensation Insurance
AreasSydney · Melbourne · Brisbane · Adelaide · Perth
Direct line0467 624 049